{"id":345,"date":"2014-09-26T09:01:07","date_gmt":"2014-09-26T13:01:07","guid":{"rendered":"http:\/\/bridgestreet.dublinohiousa.gov\/2015\/?p=345"},"modified":"2015-02-18T10:39:33","modified_gmt":"2015-02-18T15:39:33","slug":"road-projects-that-begin-bridge-street-district-grid-on-schedule","status":"publish","type":"post","link":"http:\/\/bridgestreet.dublinohiousa.gov\/buzz\/road-projects-that-begin-bridge-street-district-grid-on-schedule\/","title":{"rendered":"Road projects that begin Bridge Street district grid on schedule"},"content":{"rendered":"

Work on two roads that will be part of the Bridge Street District network is underway.<\/p>\n

A portion of John Shields Parkway and a road that will connect Dale Drive to Tuller Ridge Drive are currently under construction and are expected to open to traffic this fall.<\/p>\n

The roads are the first to be constructed in the network of streets planned for the Scioto River area of the Bridge Street District that is expected to bring dense, urban-style redevelopment to Dublin’s core.<\/p>\n

Read the story \u2013 Dublin Villager \u2013 January 27, 2015<\/a><\/strong><\/h3>\n

 <\/p>\n","protected":false},"excerpt":{"rendered":"

Work on two roads that will be part of the Bridge Street District network is underway. A portion of John Shields Parkway and a road that will connect Dale Drive to Tuller Ridge Drive are currently under construction and are expected to open to traffic this fall. The roads are the first to be constructed in the network of streets planned for the Scioto River area of the Bridge Street District that is expected to bring dense, urban-style redevelopment to Dublin’s core. Read the story \u2013 Dublin Villager \u2013 January 27, 2015  <\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_links_to":"","_links_to_target":""},"categories":[52],"tags":[],"_links":{"self":[{"href":"http:\/\/bridgestreet.dublinohiousa.gov\/wp-json\/wp\/v2\/posts\/345"}],"collection":[{"href":"http:\/\/bridgestreet.dublinohiousa.gov\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/bridgestreet.dublinohiousa.gov\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/bridgestreet.dublinohiousa.gov\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"http:\/\/bridgestreet.dublinohiousa.gov\/wp-json\/wp\/v2\/comments?post=345"}],"version-history":[{"count":3,"href":"http:\/\/bridgestreet.dublinohiousa.gov\/wp-json\/wp\/v2\/posts\/345\/revisions"}],"predecessor-version":[{"id":637,"href":"http:\/\/bridgestreet.dublinohiousa.gov\/wp-json\/wp\/v2\/posts\/345\/revisions\/637"}],"wp:attachment":[{"href":"http:\/\/bridgestreet.dublinohiousa.gov\/wp-json\/wp\/v2\/media?parent=345"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/bridgestreet.dublinohiousa.gov\/wp-json\/wp\/v2\/categories?post=345"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/bridgestreet.dublinohiousa.gov\/wp-json\/wp\/v2\/tags?post=345"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}